Alarm rationalization for FCC unit at 366,000 BPD refinery. Completed under budget and on schedule. Net alarm reduction 31%. Averaged 115 tags /d.
- Facilitated alarm rationalization efforts for mission-critical Fluid Catalytic Cracker (FCC) unit this 366,000 bpd refinery.
- Work was completed on schedule and multiple man-weeks under budget.
- Rationalized DCS and SIS systems on this unit to corporate & site-specific standards.
- Coached project team on best-practices for alarm rationalization.
- Provided guidance on implementation of rationalization design to control systems.
- Performed implementation upload of rationalization results to master alarm database (MAD).
Jun 2017 – Jul 2017
- Facilitated alarm rationalization efforts for mission-critical Fluid Catalytic Cracker (FCC) unit at the state’s largest (63,000 bpd) refinery.
- Rationalized DCS and SIS systems on this unit to corporate standards.
- Coached project team on best-practices for alarm rationalization.
- Provided guidance on implementation of rationalization design to control systems.
Sep 2016 – Oct 2016
- Facilitated alarm rationalization efforts for mission-critical Fluid Catalytic Cracker (FCC) unit at the company’s flagship 380,000 bpd refinery.
- Rationalized DCS and SIS systems on this unit to corporate standards.
- Coached project team on best-practices for alarm rationalization.
- Provided guidance on implementation of rationalization design to control systems.