Jun 2017 – Jul 2017
- Facilitated alarm rationalization efforts for mission-critical Fluid Catalytic Cracker (FCC) unit at the state’s largest (63,000 bpd) refinery.
- Rationalized DCS and SIS systems on this unit to corporate standards.
- Coached project team on best-practices for alarm rationalization.
- Provided guidance on implementation of rationalization design to control systems.